repaired and refurbished twelve trailers furnished by Department of Health and
Human Services (DHHS). In addition, Clegg Industries was contracted to perform
all design, engineering and manufacturing for the project of converting each of
these specialty trailers into twelve mobile health care trailer units for DHHS
and National Center for Health Statistics (NCHS). Four of these trailer units,
each housing state-of-the-art medical equipment, connect together to form a mini-clinic
(MEC). Each
mobile clinic features an elevator-type wheelchair lift, an air-cooled 20 KW generator
and three built-in air conditioners with heat. Extensive documentation was provided
to reference all aspects of the clinic's engineering design. When completed each
of the Examination Centers had to be identical to the others so data collected
in one will be comparable to that collected in the others. The two year contract
for developing and manufacturing the three MECs was completed on schedule. Interior
finish work included custom cabinetry, ventilation and ducting, electrical wiring,
lighting, plumbing, insulation, walls/ceiling, carpeting and telephone lines.
All
project performance specifications were met during the design and manufacturing
phases. The three Mobile Examination Centers are still in use today. These units
were completed on schedule, meeting timetable for planned data collection site
visits by NCHS. No